top of page
tanks_banner

NOW OPEN!

11505 S Wilmot Rd. Tucson AZ 85756

4.7 miles South of I10, 5.4 miles North of Sahuarita Highway

​520-500-6057

​

Monday - Friday 6 am to 3 pm 

Closed Saturday & Sunday

​​​​​​​​​​​​​​​

Now open for your construction demolition, and landscape waste disposal needs. Also available: garden, aggregate, and landscaping products. 

​

Come in with debris and leave with material for your next construction, garden, or landscape projects. 

Acceptable Wastes & Tipping Fees

  • Construction Debris - $37.00/ton

  • Demolition Debris - $37.00/ton

  • Clean Green Waste (no contamination) - $32.00/ton

  • Mixed Green Waste - $32.00/ton

  • Inert - $37.00/ton

  • Clean Cardboard  - $38/ton ($25 minimum)

*$1.00 per ton ADEQ Environmental Fee is applied to all Incoming Loads.

Minimum charge on all vehicles $25.00-$28.00

Pickup trucks without modifications    

  • Clean Green $25 per load

  • Mixed Green $25 per load

  • Construction Debris  $25 per load

  • Clean Cardboard $18 per load 

Tarps should be on vehicle loads when entering site, and untarped by the time the vehicle reaches the scale.

​

Clean Inert Price Per Load (upon inspection) 

Clean concrete and asphalt millings charged by the load with prior approval.​

  • Pickup or 1-axle trailer - $25/per load

  • Trailer (over 12', 6-wheel, or flat rack - $40/per load

  • 10-wheel - $45/per load

  • Semi or transfer - $50/per load 

​​​​

Clean fill loads contaminated with large rocks, concrete, construction debris, green waste, etc. will be charged the $37.00/ton rate ($28.00 minimum)

​

Customer is required to separate all items and place them in the location designated for that item. Prices are per item.

​

ADDITIONAL HANDLING FEES CHARGED FOR EACH OF THE FOLLOWING ITEMS:

  • Appliances (refrigerator, washer, dryer, etc.)   $20

  • Electronics  (computers, stereos, etc.)   $15

  • TVs and Monitors   $20

  • Logs/Tree Trunks over 3′ handling fee of   $50

  • Tires  without rim $10 / with rim  $15

  • Carpet / Padding by the roll   $20

  • Mattresses   $20

  • Furniture with Stuffing   $20

  • Rail Road Ties   $20

​

LEED (Leadership in Energy Efficient Design)
LEED documentation is available at customer request.
Must be arranged prior to disposal

​

*Recyclable Materials Include (See above for tipping fees):

  • Cardboard

  • Plastics

  • Metals (steel, aluminum, copper, brass, etc.)

  • Landscape Debris

  • Clean untreated wood (pallets, white wood, lumber)

  • Concrete

  • Clean green landscape debris is Composted (palm, cactus & grass cannot be composted).​

 

bottom of page